Bosch Workplace Graphics in Lincolnton NC
Overview As Bosch expanded its Lincolnton campus, the workplace environmental branding needed to scale with it. Bosch announced in 2023 that it would invest $130 million in the site, adding more than 325,000 square feet over a 24-month plan for manufacturing, logistics, and warehouse operations at a campus that has supported power tool accessory production since 1960. That larger campus story shaped the project from the start. Rather than one isolated install, the work unfolded across three connected phases: foundational graphics in the existing facility in 2023, expanded employee and meeting space graphics in 2024, and a broader design, production, and installation rollout in 2025 that carried the same visual language into Bosch’s new expansion building. Across those phases, the goal stayed consistent. The Lincolnton campus needed spaces that could reflect Bosch’s product identity, ...